基于可变权重理想点法的露天矿初始拉沟位置确定  被引量:3

Determination of initial trenching position based on ideal point method with variable weight in open-pit mine

在线阅读下载全文

作  者:郭强 GUO Qiang(China Coal Technology and Engineering Group Shenyang Design .& Research Institute, Shenyang 110015, China)

机构地区:[1]中煤科工集团沈阳设计研究院有限公司,辽宁沈阳110015

出  处:《露天采矿技术》2017年第6期23-26,共4页Opencast Mining Technology

摘  要:根据矿山的开采境界,依据露天矿拉沟位置的选择原则以及该矿山的特殊地质地形条件提出了3种首采区及拉沟位置方案,建立了含7种评价指标的评价体系,引入基于可变权重的理想点法建立的分析评价计算模型,求解得出各方案的理想点距离和贴近度,按照贴近度取值标准确定了最优的首采区及拉沟位置方案。According to the mining state, the selection principles of open-pit mine trenching position and the special geological condition, the article puts forward three kinds of first mining area trenching position schemes, and establishes seven evaluation system of evaluation indicators. The article establishes the analysis and evaluation model based on the ideal point method with variable weight, obtains the ideal point distance and closeness degree, according to the similarity value standard to determine the optimal first mining area trenching position.

关 键 词:露天矿 拉沟位置 多目标决策 可变权重理想点法 

分 类 号:TD216[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象