检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:景兆凯[1] 王刚[1] 师永霞[1] JING Zhao-kai WANG Gang SHI Yong-xia('No.2 Institute of Geo-Environment Survey of Henan,Zhengzhou Henan 450053, Chin)
机构地区:[1]河南省地矿局第二地质环境调查院
出 处:《西部探矿工程》2017年第8期200-203,206,共5页West-China Exploration Engineering
摘 要:介绍长距离顶管施工的特点和郑东新区的地质条件。通过本区长距离顶管工程实例指出传统理论计算顶进阻力结果与实际存在的差异。根据顶力监测结果反算摩阻力,准确计算总顶进阻力,提高了施工效率,创造良好的效益。This paper introduces the geological conditions of Zhengdong new district and characteristics of long distance pipe jacking construction. Through the long distance pipe jacking engi- neering examples the differences between calculation results and actual jacking resistance existed in the traditional theory is indicat- ed. According to the monitoring results the frictional resistance is back-caleulatedand total jacking resistance is accurately calculat- ed, which improve the efficiency of the construction and create a good benefit.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117