西藏金河瓦托水电站坝址方案论证  

Scheme demonstration of dam site of Watuo hydropower station in Jinheriver of Tibet

在线阅读下载全文

作  者:齐立伟[1] 都兴洋[1] 宁卫琦 

机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021

出  处:《东北水利水电》2017年第8期3-4,8,共3页Water Resources & Hydropower of Northeast China

摘  要:瓦托水电站可供选择的坝址范围为金河水电站库尾~勒珠水电站厂址下游长约5.73 km河段。文中从地形地质条件、枢纽布置、导流布置等方面,对瓦托水电站坝址进行综合分析论证,最终选择的坝址位于昌都市卡若区列巴村金河下游约2.5 km处。The optional range of dam site of Watuo hydropower station is about 5.73 km long river from the end of Jinhe hydropower station reservoir to the lower reaches of the site of The Lezhu hydropower station. The paper analyzes and demonstrates comprehensively the dam site of Watuo hydropower station from the topography and geology condition, the project layout, the division layout, and so on. The final selection of the dam site is located at downstream 2.5km of Jinhe river in Lieba village of Karuo district of Changdu city.

关 键 词:瓦托水电站 坝址 方案论证 

分 类 号:TV22[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象