工作面安装无极绳连续牵引绞车技术研究  被引量:1

Research on the Installation of Endless Rope Continuous Traction Winch on Working Face

在线阅读下载全文

作  者:王小刚 Wang Xiaogang(No.5 Coal Mine of Yangquan Coal Mine Group, Yangquan Shanxi 04520)

机构地区:[1]山西阳泉煤业(集团)有限责任公司五矿五林井准备队,山西阳泉045209

出  处:《机械管理开发》2017年第8期101-102,145,共3页Mechanical Management and Development

摘  要:根据生产需要,需在8506进风系统巷北回风口往里7 m左帮安装无极绳连续牵引绞车,因此从安装要求、无极绳连续牵引车钢丝绳张紧要求、安全注意事项等方面进行了技术安装研究,在工作面安装无极绳连续牵引绞车后,绞车运行良好,可承担该工作面的上、下料作业,综合保障了安装工程的安全。According to the need of production, in the 8506 Lane North return air inlet system to help install 7m left endless rope continuous traction winch, from the installation requirements of endless rope continuous tractor wire rope tension, studied the technology installation safety considerations, installation of endless rope continuous traction winch in working face after the winch is running well, can undertake the work surface, and feeding operations, comprehensive protection installation engineering safety.

关 键 词:工作面 无极绳连续牵引绞车 技术 

分 类 号:TD823[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象