检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:齐梅兰[1,2] 杨熠琳 郐艳荣[1] QI Meilan YANG Yilin KUAI Yanrong(School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China Beijing's Key Laboratory of Structural Wind Engineering and Urban Wind Environment, Beijing Jiaotong University, Beijing 100044, China)
机构地区:[1]北京交通大学土木建筑工程学院,北京100044 [2]北京交通大学结构风工程城市风环境北京市重点实验室,北京100044
出 处:《中国铁道科学》2017年第4期33-39,共7页China Railway Science
基 金:国家自然科学基金资助项目(51578062);中国铁路总公司科技研究开发计划项目(2014G009-H)
摘 要:针对采沙河床演变引起的桥墩冲刷问题,通过水力学分析和水槽试验研究底坎设置对上游桥墩减冲的效果,运用粒子图像技术观测水流紊动结构的变化,分析底坎尺度和水流变化与桥墩减冲效率的相关性。结果表明:相同水流条件下,桥墩减冲效率与底坎的相对高度以及底坎与桥墩之间的距离有关;桥墩减冲效率随来流强度的增大而减小;在试验范围内,底坎的高度与水深之比为1/5~1/3、底坎位于桥墩下游1~1.5倍桥墩直径的距离时,对桥墩的减冲效果最佳,桥墩的减冲效率可达20%~30%;底坎的减冲机理是通过降低水流紊动强度、切应力及紊动涡量降低水流的输沙能力,从而实现对桥墩的防护。Concerning about the issues of pier scour induced by sand excavation in riverbed,hydraulic analysis and flume experiments were conducted to study the effect of sill setting on the scour mitigation of upstream pier.The variation of flow turbulence structure was measured by particle image velocimetry technology to explore the correlation between sill scale,the redistribution of water flow and the efficiency of pier scour mitigation.Results indicate that under the same flow condition,the efficiency of pier scour mitigation varies with the sill height above riverbed and the distance between the sill and pier.The efficiency of pier scour mitigation decreases with the increase of inflow intensity.Within experiment range,if the ratio of sill height and water depth is equal to 1/5-1/3and the sill is located downstream of the pier with a space of 1-1.5times of pier diameter,the scour mitigation effect on pier is the best and the efficiency of pier scour mitigation is up to 20%-30%.The scour mitigation mechanism by bed sill is to decrease turbulence intensity,shear stress and turbulence vorticity of water flow,and to reduce the sediment transport capacity of water flow,so as to realize pier protection.
分 类 号:U442.32[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117