机构地区:[1]中交第一公路勘察设计研究院有限公司,西安710068 [2]陕西省公路交通防灾减灾重点实验室,西安710068
出 处:《路基工程》2017年第4期162-166,174,共6页Subgrade Engineering
摘 要:以内蒙地区窑沟黄土隧道为工程依托,通过对施工过程中该隧道围岩变形的监控量测,了解隧道开挖过程中黄土隧道围岩变形的规律:拱部沉降的量值远大于净空收敛的量值,进而明确黄土隧道大变形的控制应以拱部沉降为主。运用有限元分析确定黄土隧道施工过程中控制隧道大变形的途径:初期支护的及时跟进能显著降低黄土隧道围岩的变形;桩处理隧道黄土地基可以有效地降低围岩变形;系统锚杆的施作对围岩变形基本没有影响。The deformation law of loess tunnel surrounding rock in the process of tunnel excavation is known via the monitoring measurement of deformation of the kiln tunnel surrounding rock during construction. The arch settlement value is far greater than the clearance convergence value, so it is clear that the control of the large deformation of loess tunnel should be based on the arch settlement. The ultimate way to control the large deformation of loess tunnel during the construction process through the finite element: timely follow-up of primary supporting can significantly reduce the deformation of loess tunnel surrounding rock ; pile treatment for loess tunnel foundation can effectively reduce the deformation of surrounding rock. The construction of system anchor bar has no impact on the deformation of surrounding rock basically.
关 键 词:黄土隧道工程 大变形 监控量测 有限元分析 初期支护
分 类 号:U416.169[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28