作 者:邹陈[1]
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《路基工程》2017年第4期233-237,共5页Subgrade Engineering
摘 要:针对巨型堆积体的工程地质特征的现场调查分析,认为其形成机制是岩体发生弯曲拉裂变形,进而以崩塌破坏形式堆积而成,变形影响因素主要是岩土体组成及结构、大气降雨和地下水以及坡体后缘物质的补给。通过堆积体稳定性定性评价和定量计算,综合分析其稳定性状态。结合环境地质特征,提出一系列针对性治理措施,避免人为扰动引发工程滑坡,保障铁路施工运营安全。Based on the site investigation and analysis of the geological characteristics of huge accumulation, it is considered that the formation mechanism is produced by bend-tension crack deformation of rock and formed by collapse. The main factors causing the deformation are: rock-soil constitution and structure, rainfall and ground water and supply of material from the trailing edge of slope. Through the qualitative evaluation and quantitative calculation, the stability state of the accumulation is analyzed comprehensively. Combined with environmental geological characteristics, a series of targeted control measures are put forward so as to avoid an engineering landslide caused by anthropogenic disturbance and ensure railway construction and operation safety.
分 类 号:U416.164[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222