检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东工业大学自动化学院,广州510006 [2]广州机械设计研究所,广州510000
出 处:《黑龙江电力》2017年第4期307-312,共6页Heilongjiang Electric Power
摘 要:在分析智能变电站通信网络过载产生原因的基础上,根据传输机制及实时性要求对几种典型的信息流进行分类,并针对智能变电站现有信息流队列调度策略存在的不足,结合加权公平队列调度策略(WFQ),提出一种适用于变电站通信网络信息流的综合调度策略(Integrated Scheduling Strategy,ISS)。以典型D2-1型变电站通信网络拓扑为研究对象,借助OPNET仿真平台对所提出的综合调度策略与严格优先级策略(SPQ)进行仿真对比分析,结果表明综合调度策略在一定程度上具有可行性。The cause of the communication network overload in the intelligent substation is analyzed. Based on the analysis, several typical information flows are classified according to the transmission mechanism and with the real -time requirement. In view of the shortcomings of the existing information flow queue scheduling strategy in the in-telligent substation, combined with the scheduling strategy of weighted fair queuing ( WFQ) , an integrated schedu-ling strategy (ISS) is proposed for information flow of substation communication network. Taking the communica-tion network topology of typical D2 -1 type substation as the research object, simulation and comparative analyses are made on the integrated scheduling strategy (ISS) and the strict priority strategy ( SPQ) proposed by using the OPNET simulation platforrrL The simulation results show that the integrated scheduling strategy is feasible to a cer-tain extent.
关 键 词:智能变电站 信息流 网络过载 加权公平队列 综合调度策略.
分 类 号:TM63[电气工程—电力系统及自动化] TN926[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.35.244