检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]德州凯元热电有限责任公司,山东德州253034 [2]东华大学,上海201620
出 处:《节能》2017年第8期43-47,共5页Energy Conservation
摘 要:建立一种建筑给排水PPR管道延迟冻结保温层计算模型,提出PPR管道延迟冻结保温层厚度计算的方法,分析比较了该方法与《工业设备及管道绝热工程设计规范》、《设备及管道绝热设计导则》进行建筑给排水管道延迟冻结保温层厚度计算的结果,给出常用PPR管道延迟冻结保温层厚度的减少率与保温材料节省量为建筑给排水管道延迟冻结保温层厚度设计计算提供参考与借鉴。Established a building water supply and drainage PPR pipe insulation layer of delay freeze calculation model. Proposed calculation method for PPR pipes delay freezing of insulation thickness. Analysis and compared the results of this method and Code for design of industrial equipment and pipeline insulation engineering,and Guide for design of thermal insulation of equipments and pipes is for building water supply and drainage pipe delay freeze insulation layer thickness calculation,to given the reduced rate of common PPR pipeline delay freeze insulation layer thickness of and the save volume of insulation material. In order to provides reference for the design calculation of building water supply and drainage delay freeze insulation layer thickness.
关 键 词:PPR管道 延迟冻结 保温层厚度 管材热阻 节省量
分 类 号:TK01[动力工程及工程热物理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145