检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]郑州大学电气工程学院,河南郑州450001 [2]国网郑州供电公司,河南郑州450001
出 处:《供用电》2017年第9期81-84,51,共5页Distribution & Utilization
摘 要:自备电厂受自身负荷及机组运行状态影响可能出现用网电和向电网供电2种状态。由于上下网电价的差异,需要对上下网电量分别进行计量。当自备电厂与电网中2个及以上变电站联络时,受电网运行状态影响可能会出现穿越潮流。如何在上下网电量计量时剔除穿越电量对准确计量至关重要。文章针对自备电厂并网时可能存在穿越潮流现象进行分析,提出了一种基于瞬时有功功率潮流的自备电厂供用电状态判别方法,在此基础上,引入时钟同步系统,提出一种基于时钟同步信号的自备电厂上下网电量计量方案。通过计量数据对比,验证了本文所提计量方案的准确性。Influenced by their loads and operation states, self-generation power plants may consume power from the grid or supply power to the grid.It is necessary to measure the electrical power injected into the grid and absorbed from the grid because of their price difference.When the self-provided power plant is connected with two or more substations in the power grid, the influence of the power grid operation state may generate pass-through power flow.It is crucial to eliminate the pass-through electricity from in the electrical energy measurement injected into the grid and absorbed from the grid for accurate measurement. In this paper, the pass-through power flow that may occur when the power plant connected to the grid is analyzed.Then, a novel method to judge the power supply state of self-provided power plant by the instantaneous active power flow is proposed. Furthermore, a scheme for measuring the electrical power injected into the grid and absorbed from the grid of the self-provided power plant based on synchronized clock signal is presented.The accuracy of the proposed scheme is verified by comparing with the approximate measurement data.
分 类 号:TK31[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28