检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王艳成[1] 杨保俊[1] 周金刚[1] 王百年[1] 左权[1] 陈洋[1]
机构地区:[1]合肥工业大学化学与化工学院,合肥230009
出 处:《工业用水与废水》2017年第4期33-38,共6页Industrial Water & Wastewater
摘 要:采用絮凝沉降法处理腈纶纺丝后纺废水。以废水的浊度为主要考察指标,筛选并确定PAC为较适宜的絮凝剂。通过单因素试验和正交试验考察并确定了较适宜的絮凝沉降工艺条件为:快速搅拌絮凝10 min,慢速搅拌絮凝10 min,沉降50 min,絮凝剂PAC投加量为25 mg/L,絮凝温度为40℃,体系pH值为6.77。此优化条件下处理后水样的浊度为0.51 NTU,浊度去除率达到86.64%。After spinning wastewater from acrylic fibers spinning was treated by flocculation sedimentation. Taking turbidity as the main evaluating indicator, PAC was screened and finally determined as the proper flocculant. Through single factor test and orthogonal test, the optimal condition for flocculation sedimentation was investigated and confirmed as follows: the fast-stirring flocculation time was 10 min, the low-stirring fiocculation time was 10 min, the sedimentation time was 50 min, the dosage of flocculant PAC was 25 mg/L, the flocculation temperature was 40 ℃, the pH value of the system was 6.77. Under the above condition, the turbidity of the water sample was 0.51 NTU with a removal rate of 86.64%.
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43