检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王世刚
机构地区:[1]新疆哈密地区水利水电勘测设计院,新疆哈密839000
出 处:《西北水电》2017年第4期11-14,共4页Northwest Hydropower
摘 要:论述了安拉沟水库混凝土面板砂砾石坝的设计特点,主副坝连接采用折线连接,主坝为整体式钢筋混凝土面板、副坝为分离式混凝土面板。对面板和趾板的设计、止水设计、坝料的分区设计、不同料源的分区填筑设计、大断层的防渗处理措施等进行了论述,以供同类工程设计参考。The design characteristics of the concrete faced sandy gravel dam of Anlagou reservoir are demonstrated. Both main and auxiliary darns are connected with broken line. The main dam is equipped with integrated reinforced concrete face but the auxiliary dam is with separated concrete face. Design of concrete face, plinth, waterstop, dam material zoning, embankment with different materials in zone, impermeable treatment measures for large fault, ete are demonstrated so as to provide the similar projects with reference.
关 键 词:坝料设计 止水 顺河大断层 防渗措施 基础灌浆 安拉沟水库
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.149.241.32