检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨利伟
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007
出 处:《广西电力》2017年第4期27-30,共4页Guangxi Electric Power
摘 要:随着南方电网特高压直流线路建设的发展,特高压直流培训基地的建设和学员技能培训意义重大。根据一拟建特高压直流培训基地的场地特点,结合已建线路的相关参数,对4种±500 kV双回直流铁塔的导线极性布置方案进行计算、分析和对比。最后综合考虑工程实际、各项培训需要及投资成本等因素,确定了优化设计方案。With the development of uhra HVDC line in the southern power grid, it is of great significance for the construction of ultra HVDC training base and the skill training of students. According to the site characteristics of an ultra HVDC training base to be built and the technical parameters of transmission line built, four kinds of conductor polarity layout schemes of ±500 kV double circuit tower are calculated, analyzed and compared. Finally, the optimal design scheme is determined by comprehensively considering factors including the actual situation of the project, every training needs and investment cost and so on.
关 键 词:特高压直流培训基地 双回路塔 ±500kV直流线路 导线布置
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.138.61.216