干扰条件下高速铁路列车运行实时调整问题研究  被引量:15

Real-time Train Rescheduling on High-speed Railway under Disruption Condition

在线阅读下载全文

作  者:邓念[1] 彭其渊[1] 占曙光[1] 

机构地区:[1]西南交通大学交通运输与物流学院,成都610031

出  处:《交通运输系统工程与信息》2017年第4期118-123,共6页Journal of Transportation Systems Engineering and Information Technology

基  金:国家自然科学基金(U1234206)~~

摘  要:高速铁路列车在日常运行过程中不可避免地会受到各种干扰的影响,导致列车偏离计划运行图,需要及时调整列车运行图.本文主要针对由干扰导致的区间能力全失效情况下的列车运行图调整问题进行研究,构建列车运行调整混合整数线性规划模型.该模型在满足车站和线路能力约束的情况下,尽量减少取消列车的数量和列车晚点时间加权求和量.模型还阐述了提高列车终到正点率对列车运行调整结果的影响.最后以京沪高铁为例验证了模型的有效性,结果表明,在列车总晚点时间不明显增加的情况下可以提高列车终到正点率.Trains may deviate from their original timetable during daily operations due to disruptions. This requires dispatchers to adjust the timetable. This paper focuses on how to reschedule the timetable of trains that are confronted with a railway section that is blocked due to a disruption. A mixed-integer linear programming model is formulated to solve the timetable rescheduling problem. In this model, the number of canceled trains and the total weighted delay of the trains are minimized, while adhering to the capacities of the stations and segments. The impact of improving the final arrival punctuality rate of trains on the rescheduling results is analyzed. Finally, the model is tested on real-world instances of the Beijing-Shanghai high-speed railway line. The results show that the rate of final arrival punctuality of trains can be improved by little increasing the total train delay.

关 键 词:铁路运输 实时调整 调度指挥 运行干扰 

分 类 号:U238[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象