机构地区:[1]国网山西省电力公司电力科学研究院,山西太原030001 [2]中国能源建设集团山西电力建设有限责任公司,山西太原030012
出 处:《山西电力》2017年第4期60-62,共3页Shanxi Electric Power
摘 要:为降低机组厂用电、节约投资成本,对某350 MW超临界循环流化床发电机组进行单台高压流化风机运行调整试验,并分析了该运行方式的可行性及效果。试验结果表明,单台高压流化风机能够满足机组全负荷段的运行要求;与2台运行比较,节电效果明显。在后续基建相关类型机组时,设计阶段应重新考虑高压流化风机的出力及配置,避免投资浪费和增加运行成本。In order to reduce the power consumption of the unit to save cost, a single high pressure fluidized fan operation adjustment test was carried out for a 350 MW supercritical circulating fluidized bed generator unit, and the feasibility and effect of the operation mode were analyzed. The experimental results show that a single high pressure fluidizing fan can meet the requirements of the unit operating with whole load. Compared with two fans in operation, the energy-saving effect is obvious. When establishing similar units thereafter, the output and configuration of high pressure fluidizing fan should be reconsidered during design stage to avoid excessive investment.
分 类 号:TK229.66[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.89