条带法沉降分析的路基压矿开采方法  被引量:2

Pressed Orebody Mining Method Based on Strip Mining Subsidence Analysis

在线阅读下载全文

作  者:徐帮树[1] 张明伟[1] 夏鹏[1] 崔宇鹏[1] 金纯[1] 

机构地区:[1]山东大学岩土与结构工程研究中心,济南250061

出  处:《科学技术与工程》2017年第24期173-177,共5页Science Technology and Engineering

基  金:国家自然科学基金(50909056);山东省自然科学基金(ZR2014EEM014)资助

摘  要:针对"三下"压矿的开采问题,阐述了提高开采回采率的必要性和可行性。类比隧道巷道掘进应力分布特征,提出了简化的条带法和房柱法开采沉降计算公式;路基下压矿体因保守设计等原因造成资源浪费,建议当深厚比较大、辅以条带房柱法开采、矿层顶板力学性能较好时,可加大下压矿开采。淄博某黏土矿上存路基,压矿量大,采用条带法开采和垂直留设法设计,利用ABAQUS和FLAC^(3D)论证方案的合理性,验证了沉降计算公式。According to the ore mining problem in the case of three pressure situation,the necessity and feasibility of improving mining recovery rate are expounded. By analogy to the tunnel drivage stress distribution characteristics,a simplified strip method and room-and-pillar method mining subsidence calculation formula are proposed.Because of the conservative design and some other reasons,a certain degree waste of resources are caused. When the depth is quite large and supplemented by banding room and pillar mining method as well as the mechanical properties of bed top is good,the exploit of pressed ore can be increased. The clay mine project in Zibo has a large roadbed pressure ore,the vertical setting method and the strip method mining plan is proposed. By means of ABAQUS and FLAC3 D,the rationality of the scheme is demonstrated,the settlement calculation formula is verified.

关 键 词:压矿 地表沉降 路基 条带法 

分 类 号:TD327[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象