考虑设备修复非新的非等效并行jobshop调度联合优化  被引量:1

A Joint Optimization of Non-Identical Parallel Mutil-Machine Job Shop Scheduling with Consideration of Imperfect Maintenance Effect

在线阅读下载全文

作  者:费杨阳 马慧民[2] 

机构地区:[1]上海理工大学管理学院,上海200093 [2]上海电机学院管理学院,上海201306

出  处:《物流工程与管理》2017年第8期150-153,共4页Logistics Engineering and Management

基  金:国家自然科学基金资助项目(No.71472125)

摘  要:针对带有非等效并行机的作业车间调度问题,提出一种考虑设备预防性维护和生产线调度的联合优化模型。以最小化最大完工时间为优化目标,考虑设备修复非新。设计了一种两阶段遗传算法进行求解。为验证所提出的联合优化模型的有效性,将其与不同维护策略下车间最大完工时间的实验数据结果相比较,结果反映该模型效果更好。Aiming at job-shop problem with non-identical parallel multi-machine scheduling,a joint optimization model is proposed with considering both preventive maintenance and production scheduling. The object of problem is to minimize the maximum completion time. Meanwhile,the equipment cannot be repaired to a new level is considered. A two-stage genetic algorithm is designed to solve this problem. In order to verify the validity of this joint optimization model. Comparing the experimental data with the maximum completion time of the workshop under different maintenance strategies,the results reflect that this model works better.

关 键 词:预防性维护 非等效并行机 作业车间 修复非新 遗传算法 

分 类 号:F251.2[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象