作 者:Yucheng HUANG Lun JI Rui WEN Ming ZHANG
机构地区:[1]National Center for Materials Service Safety, Joint USTB-Virginia Tech Lab on Multifunctional Materials, University of Science and Technology Beijing, Beijing, China [2]Virginia Tech, Blacksburg, VA 24061, United States [3]School of Transportation Science and Technology, Harbin Institute of Technology, Harbin, China [4]Shanghai Investigation, Design & Research Institute CO., LTD, Shanghai, China [5]Highway Administration Bureau of Liaoning Provincial Communications Department, Harbin, China
出 处:《Frontiers of Structural and Civil Engineering》2017年第3期308-314,共7页结构与土木工程前沿(英文版)
摘 要:In order to implement the objective mix design of hot mix asphalt adequately during the construction process, the significance of objective mixing ratio was elaborated, and the variability of materials and its control method were analyzed. An engineering example is used to illustrate the debugging process of asphalt mixture batching & mixing plant and the dynamic quality management methods. The results show that the set of methods can not only implement the objective mixing ratio of hot mix asphalt adequately, but also control production during the construction process effectively.In order to implement the objective mix design of hot mix asphalt adequately during the construction process, the significance of objective mixing ratio was elaborated, and the variability of materials and its control method were analyzed. An engineering example is used to illustrate the debugging process of asphalt mixture batching & mixing plant and the dynamic quality management methods. The results show that the set of methods can not only implement the objective mixing ratio of hot mix asphalt adequately, but also control production during the construction process effectively.
关 键 词:asphalt mixture target mixing ratio mix design implementation batching & mixing plant debugging
分 类 号:U416.217[交通运输工程—道路与铁道工程] U414.75