麒麟寺水电站尾水清淤的实践与探讨  被引量:2

Implementation and discussion on silt excavation for the tailrace of Qilinsi hydropower station

在线阅读下载全文

作  者:贾进荣 赵喜成 陈容 郭俊兵 

机构地区:[1]大唐甘肃发电有限公司碧口水力发电厂,甘肃文县746412

出  处:《大坝与安全》2017年第3期1-6,共6页Dam & Safety

摘  要:麒麟寺水电站自投产发电以来,由于尾水区域泥沙淤积、下游河道被侵占束窄等原因,电站尾水位高于设计尾水位,机组出力难以达到额定值,并严重影响行洪安全。为解决这一问题,提出了对尾水区域淤积和下游河道采取开挖、疏浚等工程措施。对这些工程措施从设计、施工和实施后的效果等方面进行了分析探讨,为其他类似项目提供一些参考。Since operation of Qilinsi hydropower station, the actual tail water level is higher than the de- signed level because of the siltation in the tail water area and the narrowed riverbed in the lower reach. As a result, the power output and flood control are seriously affected. To solve this problem, engineering measures such as excavation and dredging of the lower reach are proposed. In this paper, the design, construction and engineering benefits of these measures are analyzed and discussed, worthy references.

关 键 词:麒麟寺水电站 尾水清淤 

分 类 号:TV851[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象