An automatic phase-matching technique of CYCIAE-100 cyclotron  被引量:2

An automatic phase-matching technique of CYCIAE-100 cyclotron

在线阅读下载全文

作  者:Xiao-Liang Fu Zhi-Guo Yin Bin Ji Zhen-Lu Zhao Jun-Yi Wei Tian-Jue Zhang 

机构地区:[1]China Institute of Atomic Energy, Beijing 102413, China

出  处:《Nuclear Science and Techniques》2017年第9期25-30,共6页核技术(英文)

基  金:supported by the National Natural Science Foundation of China(Nos.11375274 and 11475269)

摘  要:The RF system of CYCIAE-100 cyclotron has two cavities, which are driven separately by two identical 100-k W RF amplifiers. Due to the power on sequence issue of the three DDSs in the LLRF systems, each time when the system is individually switched on, the phase relationship may not satisfy the requirements of beam acceleration. Instead of adding an extra reset logic to the system, a search and validation algorithm based on the decision tree has been carried out to make sure the phase of the two cavities is correct right after applying power to the cavities, taking advantage of existing hardware resources. In the first year of operation, there are more than 20 times of scheduled shutdown of the cyclotron system. For each time when the cyclotron RF system is completely shutdown and powered on again, the operator confirmed that the phase matching of the two cavities can be done automatically within 30 s. The related work, including the optimization of the phase detector and the development and validation of the algorithm, is reported in this paper.The RF system of CYCIAE- 100 cyclotron has two cavities, which are driven separately by two identical 100-kW RF amplifiers. Due to the power on sequence issue of the three DDSs in the LLRF systems, each time when the system is individually switched on, the phase relationship may not sat- isfy the requirements of beam acceleration. Instead of adding an extra reset logic to the system, a search and validation algorithm based on the decision tree has been carried out to make sure the phase of the two cavities is correct right after applying power to the cavities, taking advantage of existing hardware resources. In the first year of operation, there are more than 20 times of scheduled shutdown of the cyclotron system. For each time when the cyclotron RF system is completely shutdown and powered on again, the operator confirmed that the phase matching of the two cavities can be done automatically within 30 s. The related work, including the optimization of the phase detector and the development and validation of the algorithm, is reported in this paper.

关 键 词:回旋加速器 相位关系 匹配技术 射频系统 验证算法 射频放大器 相位检测器 DDSS 

分 类 号:TL542[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象