检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韦继祖
机构地区:[1]广西桂通工程咨询有限公司,广西南宁530022
出 处:《西部交通科技》2017年第11期95-98,共4页Western China Communications Science & Technology
摘 要:近年来,我国桥梁工程技术日异月新,在高速公路、市政工程跨江大桥及新建铁路桥梁工程建设中,大型深水群桩基础形式得到广泛应用。文章结合某高速公路特大桥梁工程钢围堰深水群桩施工实例,对采用钢围堰在深水群桩施工中的工序流程安排、施工质量控制以及在钻孔灌注桩施工中遇到异常地质条件时的难点及对策进行分析阐述,希望能为桥梁的质量控制及施工提供参考。In recent years,the bridge engineering technology is developing rapidly in China,and in the construction of expressway, municipal engineering cross-river bridge and new railway bridge project, the form of large-scale deep-water group pile foundation is widely used.In combination with construc- tion example of steel cofferdam deep-water group pile in an expressway extra-large bridge,this article analyzed and discussed the process flow arrangement and construction quality control in deep-water group pile construction by using the steel cofferdam as well as the difficulties and countermeasures under abnormal geological conditions encountered in the construction of bored pile, hoping to provide a reference for the quality control and construction of the bridge.
分 类 号:U443.162[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.27