不同开采条件对房采区下开采影响模拟  

Simulation of Mining Effect of Different Mining Conditions on Chamber Mining Goaf

在线阅读下载全文

作  者:李志伟 缑子锦 LI Zhiwei GOU Zijin(Dongfeng Coal Mine Co. , Ltd. , Shanxi Lanhua Group, Jincheng 048000, Chin)

机构地区:[1]山西兰花集团东峰煤矿有限公司,山西晋城048000

出  处:《山西煤炭》2017年第3期4-7,22,共5页Shanxi Coal

摘  要:22202工作面为大柳塔矿22煤二盘区已回采的大采高综采工作面,22202工作面开采区域正上方为12煤房采采空区,12煤与22煤层间距25.8m^30.37m;在回顺14联行靠近2-2煤火烧边界顶帮煤层局部松散变软。根据22202工作面上方采空区煤柱的特点,运用FLAC3D建模分析不同煤柱情况下工作面开挖过程中煤壁超前应力分布特征、工作面开挖过程中上方采空区煤柱失稳特征和工作面顶板压力及下沉量,得出工作面超前应力分布规律及煤层顶板下沉量变化规律。No. 22202 working face is a large-mining-height fully-mechanized mining face in the second panel, No. 22 coal seam, Daliuta Mine. The mining area of the No. 22202 working face is directly under the chamber mining goal of No. 12 coal seam. The interval between No. 12 and No. 22 coal seam ranges from 25.8 m to 30.37 m. The coal roof and wall turns loose at 2-2 coal fire boundary of No. 14 air return roadway. Based on the coal pillars of the goaf above the No. 22202 working face, FLACaD is used to analyze, under different coal pillars, pre-stress distribution of the coal wall, the instability of the coal pillars in the above goaf, and the stress and subsidence of the coal roof in order to achieve the pre-stress distribution and subsidence variation of the coal roof.

关 键 词:大柳塔矿 采空区煤柱 超前应力分布 煤矿失稳 下沉量 

分 类 号:TD323[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象