检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭彭 郭飞[2] 秦道谋 PENG Peng GUO Fei QIN Dao-mou(No.29 Construction Department, China Coal Mine Construction Group, Suzhou 234000,China Yuandian Yijing Coal Mine, Huaibei Mining Group Co., Ltd., Huaibei 235000, China Huaibei Huaiwu Construction Supervision Co., Ltd., Huaibei 235000, China)
机构地区:[1]中煤矿山建设集团二十九工程处,安徽宿州234000 [2]淮北矿业(集团)有限责任公司袁店一井煤矿,安徽淮北235000 [3]淮北市淮武工程建设监理有限责任公司,安徽淮北235000
出 处:《煤矿机械》2017年第9期115-116,共2页Coal Mine Machinery
摘 要:袁店一井煤矿东风井立井掘砌施工期间,采用打泄水孔与井下已有巷道连通,井壁淋水及井筒涌水通过泄水孔下泄至已有巷道,并通过永久排水系统排至地面的治水方案,有效地解决了水患问题,为井筒的顺利掘砌创造了良好条件,为类似矿井的水害治理提供了参考经验。During Yuandian Yijing Coal Mine Dongfeng shaft digging,using drainage holes and underground existing tunnel has connected ,spraying and gushing water through the drainage hole discharged into the existing tunnel,and the permanent drainage system to the ground,effectively solve the problem of flooding,and created a good condition for the shaft digging,provide a reference for the similar mine water disaster control.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3