黄金峡水利枢纽高水头过鱼建筑物设计  被引量:4

Design of high-head fish-pass structure for Huangjinxia Water Control Project

在线阅读下载全文

作  者:张鹏利 朱世洪 万继伟 黎贤访 ZHANG Pengli ZHU Shihong WAN Jiwei LI Xianfang(Hanjiang-to-Weihe River Valley Water Diversion Project Construction Co. , Ltd. , Shaanxi Province, Xi'an 710010, Shaanxi, China Changjiang Institute of Survey, Planning, Design and Research, Wuhan 430010, Hubei, China)

机构地区:[1]陕西省引汉济渭工程建设有限公司,陕西西安710010 [2]长江勘测规划设计研究院,湖北武汉430010

出  处:《水利水电技术》2017年第8期44-48,共5页Water Resources and Hydropower Engineering

摘  要:黄金峡水利枢纽鱼道的最高运行水头为45.50 m,上游水位的变化幅度达10 m,属于高水头过鱼建筑物。根据过鱼对象的种类、习性和游泳能力,过鱼建筑物选用带同侧竖缝式隔板的"U"型槽式鱼道,并通过水力学计算得出了鱼道池室的结构尺寸,同时为适应上游水位的变化,鱼道布置了5个出鱼口。为了分析鱼道布置方案的合理性,建立鱼道进口、集鱼系统整体模型和鱼道局部模型,模拟得出了鱼道进鱼口周边区域的流速分布、过鱼池水力学特性等。试验结果表明,鱼道进鱼口区域的流场分布适宜鱼类上溯至进鱼口,过鱼池的水力学条件满足符合过鱼对象顺利上溯的要求,设计方案是合理的。The fish-way of Huangjinxia Water Control Project belongs to a high-head fish-pass structure with the maximum operation water head of 45. 5 m and the fluctuation amplitude of the upstream water level up to 10 m. In accordance with the species,behaviors and swimming abilities of the object fish,the U type trough fish-way with the clapboard of vertical joints on the same side is selected for the fish-pass structure,and then the structural dimension of the chamber of the fish-way is obtained through the relevant hydraulic calculation. For adapting to the fluctuation of the upstream water level,5 fish-outlets are arranged for the fish-way. In order to analyze the reasonability of the layout scheme for the fish-way,the integrated models of the fish-way inlet and the fish collection system as well as the partial model of the fish-way are built up,thus the velocity distribution of the surrounding area of the fish-way inlet,the hydraulic characteristics of the fish-pass pool,etc. are obtained through the simulation.The experiment result shows that the flow field distribution in the area of the fish-way inlet is suitable for fish passing upwards to the fish-way inlet,while the hydraulic condition of the fish-pass pool meets the requirement of the smooth upwards passing of the object fish as well,and then the design scheme is reasonable.

关 键 词:黄金峡水利枢纽 鱼道设计 模型试验 

分 类 号:TV691[水利工程—水利水电工程]

 