检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘竞[1] 郭现伟[1] 白冰 鄢利[1] LIU Jing GUO Xian- wei BAI Bing YAN Li(Yanzhou Coal Mining Co. , Ltd. , Jining No. 3 Coal Mine, Jining 272100, China)
机构地区:[1]兖州煤业股份有限公司济宁三号煤矿,山东济宁272100
出 处:《煤炭工程》2017年第9期91-93,共3页Coal Engineering
摘 要:以兖州煤田的济宁三号煤矿地质条件为背景,针对煤巷综掘迎头掘进施工中的片帮带来的安全问题,提出了综掘工作面帮部前探梁临时支护的结构设计,同时配套形成对应的安装工艺。实践表明,该技术可有效避免矿工在掘进迎头锚网作业期间片帮带来的安全隐患,提高巷道掘进效率,并在兖州矿区推广应用。Based on the geological conditions of Jining No. 3 Coal Mine in Yanzhou Coalfield,in order to solve the rib spalling in tunneling construction of coal roadway fully mechanized tunneling face, we proposed structure design of temporary support with rib front beam for fully mechanized tunneling face,and the corresponding installation process. The practice showed that,the technology effectively avoided the potential safety hazard caused by rib spalling during tunneling the bolt-meshing operation in tunneling face,and improved the tunneling efficiency. The technology has been gradually popularized and applied in the Yanzhou Mining Area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222