检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]铁岭市南城子水库管理局,辽宁铁岭112304 [2]辽宁省水利水电科学研究院,辽宁沈阳110003
出 处:《水利建设与管理》2017年第9期62-64,共3页Water Conservancy Construction and Management
摘 要:水库实际运用中,通过对水文资料进行系统整理、分析,可找出其中的规律,采取分期抬高汛限水位等措施,实现库容重叠使用,实现发挥水库综合效益的目的。本文根据1964—2004年的雨量及洪水资料分析成果,确定8月1日与20日,是划定南城子水库汛期分级抬高汛限水位的最佳合理分界时间,对水库科学调度运用具有重要作用。Hydrological data are sorted and analyzed systematically in actual operation of reservoirs. The laws thereof can be discovered. Measures of increasing flood limit water level, etc. are adopted to realize overlapped application of reservoir capacity and realize the purpose of exerting comprehensive benefits of reservoirs. In the paper, the rainfall and flood data in 1964-2004 are analyzed. It is determined that August I and August 20 are determined as the optimal rational boundary times for determining to increase the flood limit water level in stages during flood period of Nanchengzi Reservoir according to the analysis results. It has important function to scientific scheduling and application of the reservoir.
分 类 号:TV211.2[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.104