“双四同时”施工工艺在不连沟矿井快速建井中的应用  

Application of double four simultaneous construction technology in fast construction of Buliangou Mine

在线阅读下载全文

作  者:雷鸣 雍海江 

机构地区:[1]内蒙古蒙泰不连沟煤业有限责任公司,内蒙古鄂尔多斯010030

出  处:《煤炭科技》2017年第3期107-108,112,共3页Coal Science & Technology Magazine

摘  要:在相对成熟的采矿技术和相对先进的装备水平下,传统的"三同时"作业法建井模式已不能满足特大型煤矿快速建井的要求。不连沟矿井通过实施"双四同时"施工工艺,创建了不连沟矿井快速建井技术体系,为其他新建矿井提供了宝贵经验。In the relatively mature mining technology and relatively advanced equipment level, the traditional "three simultaneous" operation method can not meet the requirements of the rapid construction of super large coal mines. Through the implementation of "double four simultaneous" construction technology, Buliangou Mine has created a mine rapid construction technology system which is suitable for itself, which has provided valuable experience for other newly-built mines.

关 键 词:双四同时 快速建井 施工工艺 

分 类 号:TD262.1[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象