检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《合肥工业大学学报(自然科学版)》2017年第9期1283-1288,共6页Journal of Hefei University of Technology:Natural Science
基 金:教育部高等学校博士学科点专项科研基金资助项目(20120111120013)
摘 要:文章研究了机器数量变化对最大完工时间影响的同型机调度问题,其作业带有释放时间。基于改进的McNaughton规则,提出了一种多项式时间算法,进而证明了该算法能求得问题的最优解和最优机器数目m~*,同时给出了机器影响的上下界。最后,结合算例及其计算结果,并通过实验验证了该算法的有效性。The identical parallel machine scheduling problem considering the influence that additional machines may have on the makespan with unequal release dates is researched. Firstly, based on the modified McNaughton rule, a polynomial time algorithm is proposed and then it is proved that the algorithm can obtain the optimal solution and the optimal number of machines m^*, Moreover, the up- per and lower bounds of the machine impact are given, Finally, an example and the computation results are given, and the validity of the algorithm is also verified by experiment.
关 键 词:同型机调度 机器影响 释放时间 可中断 最大完工时间
分 类 号:O223[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.52.76