广大铁路祥云长大隧道配电方案探究  

A Study on the Power Supply Programs of Xiangyun Tunnel in Guangtong-Dali Railway

在线阅读下载全文

作  者:袁长明[1] 战启芳[1] YUAN Chang-ming ZHAN Qi-fang(Shijiazhuang Institute of Railway Technology Shijiazhuang Hebei 050041 China)

机构地区:[1]石家庄铁路职业技术学院,河北石家庄050061

出  处:《石家庄铁路职业技术学院学报》2017年第3期12-15,共4页Journal of Shijiazhuang Institute of Railway Technology

基  金:2015年河北省高等学校科学技术研究重点项目;项目编号:ZD2015017

摘  要:长大隧道的配电,供电距离长,电压损失大,影响用电设备的正常工作,采用交流电压补偿器不能有效提高其供电距离,只有采用高压进洞才能减少电压损失和电能损失,获得较好的经济性,本文就施工初期的低压进洞及施工中后期的高压进洞方案进行分析和研究,设计了广大铁路祥云隧道高压配电方案,满足了施工设备的用电需求,降低了运行成本。The voltage loss of long distance power supply always affects the normal operation of electrical equipment in the tunnel. AC voltage compensator can not effectively improve its power supply distance. Only by applying the high voltage power supply can reduce the voltage loss and power loss. In this paper, the low voltage power supply at the early stage and the high voltage power supply in the later stage are analyzed; the high voltage power supply programs of Xiangyun tunnel are designed. The construction process shows that the program can meet the electricity demand and reduce the operating cost.

关 键 词:长大隧道配电 供电距离 电压损失 电能损失 

分 类 号:TU852[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象