检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢先启[1] 钟冬望[2] 贾永胜[1] 司剑峰[2] 姚颖康[1] 涂圣武[2]
机构地区:[1]武汉爆破有限公司,武汉430024 [2]武汉科技大学理学院,武汉430065
出 处:《爆破》2017年第3期90-95,共6页Blasting
基 金:国家自然科学基金项目(51174147);国家自然科学基金项目(51574184)
摘 要:深基坑支撑梁爆破拆除施工顺序的确定属于一个多因素决策分析问题,以AHP分析方法为基础对影响深基坑支撑梁爆破拆除施工顺序的因素进行分类和构建层次结构模型,并在分析过程中结合数值计算的方法改进了判断矩阵的确定方法,使得改进后的判断矩阵更具有客观性,提高了决策的可靠性。结合武汉某深基坑支撑梁爆破拆除项目,对其进行分区,通过Abaqus及AHP分析方法进行爆破拆除模拟计算,并在实际施工中验证了结论的正确性和可实施性。The determination of construction sequence of deep foundation pit support beam demolition belongs to a multi-factor decision analysis problem. The influence factors of blasting demolition of deep foundation pit support beam order were classified and the hierarchical structure model was established based on the AHP analysis method. The judging matrix was improved by numerical calculation during the process of analysis, which made the judgment matrix more objectivity and improved the reliability of decision-making. Combined with a blasting demolition of deep foundation pit support beam, by partitioning the foundation and taking the Abaqus and AHP analysis method for blasting demolition simulation, the effectiveness of the conclusion is correct and practical.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31