检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李楠 赵发平 LI Nan ZHAO Faping(State Grid Luoyang Power Supply Company, Luoyang 471000, China)
出 处:《电力科学与工程》2017年第9期69-72,共4页Electric Power Science and Engineering
摘 要:通过对电力工程进行项目论证和评估,可以使电力工程项目管理更加成熟和专业化。以洛阳龙羽宜电超低排放改造项目作为研究对象进行分析,构建基于模糊层次分析法的火电厂超低排放改造项目综合评估模型,对龙羽宜电超低排放改造项目进行综合评估分析。评估结果表明,采用模糊层次分析法构建的小型火电厂超低排放改造项目评估模型可以对超低排放改造项目进行有效评价,同时也为其他项目进行投资决策提供了很好的参考价值。Through the project demonstration and project evaluation, the project management of the power engineering becomes more mature and professional. Taking the ultra-low emission project of Luoyang Longyu Power Plant as the study object, a comprehensive evaluation model for the ultra-low emission reconstruction project in a thermal power plant is built based on the fuzzy analytic hierarchy process. The result shows that the model based on fuzzy analytic hi- erarchy process can effectively conduct the evaluation for ultra-low emission reconstruction projects, and also provide some reference value for investment decisions for other projects.
分 类 号:TM611[电气工程—电力系统及自动化] X51[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38