机构地区:[1]国网新疆电力公司电力科学研究院,新疆乌鲁木齐830011 [2]河南省电力公司洛阳供电公司,河南洛阳470000 [3]国网福建省电力公司泉州供电公司,福建泉州362000 [4]国网新疆电力公司巴州供电公司,新疆库尔勒841000 [5]国网新疆电力公司哈密供电公司,新疆哈密839000
出 处:《电力电容器与无功补偿》2017年第5期7-11,共5页Power Capacitor & Reactive Power Compensation
摘 要:针对并联电容器组设计和施工中出现的电抗率和接地配置不当的问题,提出了串联电抗器以外的部件接地应考虑距离串联电抗器的距离原则,以及电抗率应根据接入电网的背景谐波、变压器绕组接线方式、绕组负荷情况进行配置,并针对实际情况进行了分类以及相应的配置方法。As for the issue of inappropriate reactance ratio and grounding configuration which is occurred in the design and construction of shunt capacitor bank, the principle of considering distance to the serial reactor for the grounding of the parts which is outside of the serial reactor is proposed. And the reactance ratios shall be configured as per the background harmonics of the connected grid, the wiring mode of the transformer winding and situation of the winding load and classification and corresponding configuration method are made in accordance with the actual situation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.207