检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高庆磊
机构地区:[1]甘肃电投炳灵水电开发有限责任公司,甘肃永靖731600
出 处:《科技视界》2017年第17期92-93,37,共3页Science & Technology Vision
摘 要:炳灵水电站是黄河龙青段梯级第十三座水电站,以发电为主,兼有一定的灌溉、供水、发展旅游及改善环境等综合利用效益。由于在甩负荷试验过程中发现,转速大于115%Ne就会误启动事故停机流程,通过反复研究、调整方案,最终解决了误停机的问题,文章主要介绍了解决上述问题的过程及效果。Bingling hydropower station is the thirteenth one of the cascade hydropower stations in the Yellow River Longqing section.It is a generation-based hydropower station,with irrigation, water supply,tourism development and environmental improvement functions. During load rejection test process,it is found that if the speed is greater than 115% Ne,accident shutdown process will be started wrongly. After repeated research and program adjustment,the paper has given the solution to this problem and the implementation effect.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28