作 者:蔡健[1,2] 彭明辉 吴瑞卿 陈庆军 谢小东[1] 魏沐杨 CAI Jian PENG Minghui WU Ruiqing CHEN Qingjun XIE Xiaodong WEI Muyang(School of Civil and Transportation Engineering, South China University of Technology, Guangzhou, Guangdong 510641, China Guangzhou Municipal Construction Group Co. , Ltd. , Guangzhou, Guangdong 510030, China State Key Laboratory of Subtropical Building Science, Guangzhou , Guangdong 510641, China)
机构地区:[1]华南理工大学土木与交通学院,广东广州510641 [2]亚热带建筑科学国家重点试验室,广东广州510641 [3]广州市建筑集团有限公司,广东广州510030
出 处:《施工技术》2017年第20期16-22,共7页Construction Technology
基 金:国家自然科学基金资助项目(51578246;51308218);华南理工大学亚热带建筑科学国家重点实验室自主研究课题项目(2015ZC18)
摘 要:以广州某超高层结构项目为背景,对其进行施工全过程仿真,并与实测结果进行了对比。研究结果表明:施工仿真计算出的竖向变形、应变数据和实测结果吻合良好;结构施工仿真分析计算所得竣工时刻的结构竖向变形分布规律并不同于一次性加载方法计算所得结果,其竖向变形曲线沿楼层呈抛物线变化;外框架与核心筒间位移差先增大后减小,然后再反向增大,更符合实际工程情况;考虑找平与否的竖向变形最大值相差接近1倍,外框架与核心筒竖向变形相差65%;不考虑混凝土收缩徐变的计算结果最大值比考虑时约小40%。要减少结构竣工时外框架与核心筒竖向变形差值,应针对不同施工阶段采取不同的核心筒超前层数。位移实测结果与施工仿真数值计算结果吻合较好,证明了本文研究的施工仿真方法的合理性。Based on a super high-rise project in Guangzhou,the whole process simulation is carried out,and the results are compared with the monitoring ones. The results show that the construction simulation of vertical deformation, strain data are in good agreement with the measured. Different from the calculated results by one-time loading on the structure,the vertical deformation distribution curve along the height of the structure by constructional simulation analysis shows parabolic shape, and the deformation difference between the outer frame and the core tube firstly increases and then decreases,and finally reversely increases. These results are more in line with the actual situation. Considering the leveling of the floor or not will lead to the almost double maximum differences of the vertical deformation,and lead to 65% difference of the vertical deformation difference between the outer frame and the core tube. Without considering creep and shrinkage of concrete materials the maximum value will be 40%smaller than when considering. In order to minimize the vertical deformation difference between outer frame and core tube,the different advancing core-tube layers can be taken at different construction stages. Displacement measured results agree well with numerical results of construction simulation,which proves the rationality of the method used in this study.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175