基于强化区间线性规划的工程项目模糊多目标均衡优化  被引量:1

Fuzzy Multi-objective Trade-off of Construction Project Based on Enhanced Interval Linear Programming Method

在线阅读下载全文

作  者:蒋红妍[1] 王鑫业 布亚军 

机构地区:[1]西安建筑科技大学土木工程学院,西安710055

出  处:《统计与决策》2017年第20期172-176,共5页Statistics & Decision

基  金:国家自然科学基金资助项目(51408459)

摘  要:文章考虑工程项目实施过程中的不确定因素,建立工期、成本、质量模糊均衡优化(FTCQP)模型;运用分解定理、强化区间线性规划(EILP)方法,求出各目标的最优值区间;进一步引入模糊偏好关系,运用模糊折衷规划法,得到FTCQP模型的最优模糊折衷解。最后通过案例分析验证了方法的合理性、有效性和可操作性。In view of the uncertainty during construction process, this paper constructs a fuzzy trade-off model about time, cost and quality (FTCQP). Firstly, the paper works out the optimal value interval by use of the decomposition theorem and en- hanced interval linear programming (EILP) method. And then the paper introduces fuzzy preference relation and employs fuzzy compromise programming to obtain the optimal compromise solution of FTCQP model. Finally a case analysis is done to verify the rationality, effectiveness and operability of the proposed method.

关 键 词:模糊多目标优化 风险水平 强化区间线性规划 模糊折衷规划 模糊偏好关系 

分 类 号:F224[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象