检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘志强[1,2] 王博[1,2] 杜健民[1,2] 李明楼
机构地区:[1]中国矿业大学力学与建筑工程学院,江苏徐州221116 [2]中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州221116 [3]中国华冶科工集团有限公司,北京100176
出 处:《煤炭科学技术》2017年第10期24-29,共6页Coal Science and Technology
基 金:国家重点基础研究发展计划(863计划)资助项目(2012AA06A402);中国博士后科学基金面上资助项目(2014M551701)
摘 要:为解决我国已定型凿井井架承载能力及结构尺寸等难以满足目前深大立井井筒凿井施工需求的现状,研制开发了适用立井井筒直径8~12 m、深度1 200 m条件的新型凿井井架。系统介绍新型单平台凿井井架的设计思路、结构特点和主要技术特征,优化、创新了新型凿井井架天轮平台和支撑体系结构,共包括2个系列(单平台、双平台)各3种规格(适用井径<8 m、8~10 m、10~12 m),最多可同时布置4套提升装置,最大悬吊荷重达10 000 k N以上。研制的单平台SA-3型凿井井架已在辽宁本溪思山岭矿副井(井筒直径10 m、深度1 503 m)井筒工程中应用,并进行了实际工况下凿井井架受力监测。结果表明:新型凿井井架具有可靠的承载性能和施工适用性,凿井设备布置空间更大,布置方式更加灵活,可有效保障深大立井井筒的安全高效施工。In order to solve the loading capacity of the approved type shaft sinking headframe,the geometry size and others hard to meet the present deep and large diameter mine shaft construction requirements,a new mine shaft sinking headframe suitable to the mine shaft with a diameter of 8 ~ 12 m and a depth of 1 200 m was researched and developed. The paper systematically introduced the design idea,structure features and major technical features of the new mine shaft sinking headframe with a single platform. The new mine shaft sinking headframe optimized and innovated the sheave wheel platform and support system structure,including two series( a single platform and double platform),each with three specifications( suitable for the mine shaft with a diameter of 8 m,8 ~ 10 m and 10 ~ 12 m. The headframe could set 4 sets of the hoisting equipments at the same time and in maximum and the max suspended loading could be over 10 000 k N. The researched and developed SA-3 type mine shaft sinking headframe with a single platform was applied to a mine shaft engineering of a mine auxiliary shaft in Benxi Sishanling Mine in China and under the actual performances,the stress monitoring and measuring of the mine shaft sinking headframe were conducted. The results showed that the new mine shaft sinking headframe would have the reliable loading performances the construction suitability. The mine shaft sinking equipment would have more large spacing to set up the equipment,the layout mode would be more flexible and thus the safety and high efficient construction of the deep and large diameter mine shaft could be effectively ensured.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7