检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:翟晓斌 游志纯 廖玉海 ZHAI Xiaobin YOU Zhichun LIAO Yuhai(Yichang Branch of Powerchina Zhongnan Engineering Corporation, Yichang 443000, Chin)
机构地区:[1]中国电建集团中南勘测设计研究院有限公司宜昌设计院,湖北宜昌443000
出 处:《水电与新能源》2017年第10期13-17,共5页Hydropower and New Energy
摘 要:水电工程外部环境的改变,要求对原有建筑物进行适当的改造,以保证工程安全,提高工程效益。以黄龙滩水电站非常溢洪道改造工程为实例,通过分析改造的必要性和可行性,对拟定的3个改造方案进行比选,最终选定弧形闸门、预应力闸墩为推荐方案,较好地解决了宣泄小流量的工程难题。Due to the changes of the external environment of hydropower projects,proper reconstruction of original structures are usually needed to ensure the safety of the project and also improve the project benefit. The reconstruction of the emergency spillway in Huanglongtan Hydropower Station is introduced. Three reconstruction schemes are compared by analyzing the necessity and feasibility of the schemes. Finally,the scheme with radial gates and pre-stressed piers is selected as it solves the small discharge flow problem.
分 类 号:TV73[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.123.155