检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何坚 HE Jian(Xiamen Tegong development Co. , Ltd, Xiamen 361000)
出 处:《福建建筑》2017年第10期75-77,94,共4页Fujian Architecture & Construction
摘 要:以万辉星城学校一期项目为例,介绍了隔震机理、隔震施工工艺流程,尤其是支墩预埋件的定位与安装、下支墩浇筑、隔震支座安装、上支墩钢筋绑扎及隔震层混凝土浇筑等关键施工要点,并从经济层面上分析了其优越性。结果表明:上部结构模型为隔震结构后,虽然增加了隔震费用,但建筑面积增大、混凝土用量及含钢量降低。Taking isolation technology in Wan Hui Xing Cheng school first phase project as an example,this paper introduced the isolation technology basic principle,the construction technological process and main control points,such as Piers embedded parts,under Piers concrete pouring,isolation bearing installation. Then,from the economic and security,its advantages were analyzed. The results show that shock-isolation construction cost increase,but the upper isolation structure can increase building area and reduce concrete and steel amount.
分 类 号:TU761[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145