检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李英海[1,2,3] 张琪 董晓华[1,2] 郭家力[1,2,3] 林伟 Yinghai Li Qi Zhang Xiaohua Dong Jiali Guo Wei Lin(College of Hydraulic & Environmental Engineering, China Three Gorges University, Yichang Hubei Hubei Provincial Collaborative Innovation Center for Water Resources Security, Wuhan Hubei Hubei Key Laboratory of Cascaded Hydropower Stations Operation & Control, China Three Gorges University, Yichang Hubei)
机构地区:[1]三峡大学水利与环境学院,湖北宜昌 [2]水资源安全保障湖北省协同创新中心,湖北武汉 [3]三峡大学、梯级水电站运行与控制湖北省重点实验室,湖北宜昌
出 处:《水资源研究》2017年第5期435-442,共8页Journal of Water Resources Research
基 金:国家自然科学基金项目(51409152,51509141);梯级水电站运行与控制湖北省重点实验室(三峡大学)开放基金(2013KJX05,2015KJX02)
摘 要:以金沙江下游溪洛渡–向家坝梯级水电站为对象,开展不同保证出力对梯级年发电调度的影响研究。首先以梯级年发电量最大为目标构建优化调度模型,进而将两电站保证出力转化为最小出力约束条件,采用动态规划法对模型进行求解。实例计算结果表明,当上游溪洛渡电站保证出力不变时,增大向家坝电站保证出力,则溪洛渡电站的年发电量不变,而向家坝电站以及梯级年发电量减小;当下游向家坝电站保证出力不变时,增大溪洛渡电站保证出力,则溪洛渡电站的年发电量减小而向家坝电站增大,梯级年发电量减小;不同保证出力对梯级最优调度过程的影响主要体现在汛前1~6月份,而在7~12月份保持不变。The influence of different guaranteed output on annual generation dispatching of the Xiluodu and Xiangjiaba cascade hydropower stations was studied. Firstly, the dispatching model targeting the maximum of annual cascade generation was built and solved by dynamic programming method with different guaranteed output constraints. The results show that when upstream Xiluodu's guaranteed output is unchanged and Xiangjiaba's guaranteed output increases, the annual power generation of Xiluodu will be unchanged, and the annual power generation of Xiangjiaba and the cascade stations will decrease. When downstream Xiangjiaba's guaranteed output is unchanged and Xiluodu's guaranteed output increases, the annual power generation of Xiluodu will decrease and Xiangjiaba will increase, the cascade stations will decrease. Effects of different guaranteed output on optimal scheduling of cascade process are mainly reflected in the flood season from January to June, while it remains unchanged from July to December.
分 类 号:TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44