检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]无锡市太湖闸站工程管理处,江苏无锡214071 [2]无锡市水利局,江苏无锡214031
出 处:《水资源开发与管理》2017年第10期62-67,共6页Water Resources Development and Management
摘 要:本文通过分析无锡市主城区控制圈取得的良好洪涝防治效果和改善水环境效益,及无锡市区其他区域存在的洪涝问题,提出全面建设高标准控制圈(区)是无锡市区实行分片洪涝防治的最佳途径。控制圈(区)应有适当规模,宜建尽建,因地制宜,河道和雨水管道防涝标准统一,控制圈与海绵城市建设同步实施;流域机构因势利导,高标准统一规划流域洪涝防治工程;控制圈(区)的分类和建设原则;高标准洪涝防治和改善水环境主要措施。In the paper,the good effect of flood control and improvement of water environmental beneficontrol circle of Wuxi,and severe flood problem in other areas are analyzed. It is proposed that comprehensiof high standard control circle (area) is the best way to implement section flood control in Wuxi. The control circle (area)should have proper size. Area suitable for construction should be constructed as far as possible. Measures should beadjusted according to local condition. River channel and rainwater pipeline flood prevention standards should be uniform.The control circle and the sponge city construction should be implemented synchronously. The make the best use of the circumstances. The river basin flood prevention projects should be unistandard; control circle (area) classification and construction principles are formulated; high-standard flood prevention andimprovement of water environment are main measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.96.88