广东省抽水蓄能电站发展与特色  

Development and Characteristics of Pumped Storage Power Station in GuangDong

在线阅读下载全文

作  者:郭建设[1] 刘林军[1] 周国斌[1] 

机构地区:[1]广东省水利电力勘测设计研究院,广东省广州市510635

出  处:《水电与抽水蓄能》2017年第B09期11-16,共6页Hydropower and Pumped Storage

摘  要:随着广东省国民经济的飞速发展,广东省抽水蓄能电站发展较快。2000年广州抽水蓄能电站8台机组全部投产,成为世界上装机规模最大的抽水蓄能电站。此后,随着在建和在做前期工作的抽水蓄能电站相继投产,广东省抽水蓄能总装机规模已接近10000MW。本文分别从工程地质、土建工程、机电工程的角度,详述广东省抽水蓄能电站的主要特色。Pumped storage power station in Guangdong developed rapidly with the development of economy. In 2000, the installed capacity of Guangzhou power storage power station has been the largest in the world after 8 generator units were put into operation. The total installed capacity in Guangdong is nearly 10000W with the operation of the stations planned. The characteristics of the power storage stations of Guangdong are discussed containing the engineering geology, civil engineering and electromechanical Engineering.

关 键 词:抽水蓄能电站 探洞 透水隧洞 一管多机 垂直防渗 可逆式水泵水轮机 

分 类 号:TV743[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象