检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴昊[1] 范奕 WU Hao FAN Yi(State Grid Suzhou Power Supply Company, Suzhou 215000, China)
出 处:《电力学报》2017年第4期287-292,317,共7页Journal of Electric Power
摘 要:风力发电在全球范围内规模不断扩大,风机能够且正在广泛参与现代能源体系的发电行为。针对风能的间歇性等特点,建立了风速的自回归滑动平均(ARMA)时间序列模型,合理模拟实际风速。通过研究风电机组停运概率分布,使用比例分配方法创建含多状态的风电系统模型。最后,以小型RBTS测试系统为例,定量分析当风电机组接入发电系统后,发电容量充裕度指标受到的影响。With the development and expansion of wind power in the world, wind turbines are widely in- volved in the generation of modern power systems. According to intermittence of wind energy, we establish the autoregressive moving average (ARMA) time series model of wind speed,in order to reasonably simu- late the actual wind speed. Based on the study of the probability distribution of wind turbines,we create a wind turbine model with multiple states by using the proportional distribution method. Finally, taking the small RBTS test system as an example,we quantitatively analyze the influence of the power capacity after connecting the wind turbine to the system.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3