检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩李明[1]
机构地区:[1]河北省水利水电勘测设计研究院,天津300250
出 处:《工业技术创新》2017年第5期59-61,共3页Industrial Technology Innovation
摘 要:南水北调配套工程沿线穿越工程众多,输水管道开槽敷设困难。为了保证配套工程建设的顺利实施,同时保证被穿越建筑物的安全,某设计单元穿越107国道工程优选了顶管穿越的设计方案。基于顶管结构分析,提出了长距离顶管加设中继间的方案,列举了施工技术要点。本工程顺利完成,验证了方案设计的可行性和合理性。There are many crossing projects along the South to North Water Diversion Project, which makes it difficult to lay the water pipeline. In order to ensure the smooth implementation of the supporting project construction and ensure the safety of the crossing buildings, a design unit called crossing 107 National Road projectoptimized selecting a design scheme of pipe jacking. Based on the analysis of pipe jacking structure, the scheme of long distance pipe jacking plus intermediate jacking station is put forward, and the construction technological points are enumerated. The project is completed successfully, which verifies the feasibility and rationality of the scheme.
分 类 号:U412.361[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.5