检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卢钢 蒋海军 房宝智 蔺世平 Lu Gang Jiang Haijun Fang Baozhi Lin Shiping(Qingdao Municipal Engineering Design & Research Institute, Qingdao 266000, Chin)
机构地区:[1]青岛市市政工程设计研究院有限责任公司,青岛266000
出 处:《给水排水》2017年第11期99-101,共3页Water & Wastewater Engineering
摘 要:结合污水管道纳入综合管廊的相关要求,以青岛市某机场综合管廊工程为例,在污水管道入廊后的横断面设计、出线井形式、检查井设置等方面进行思考,提出了降板法的出线井形式,同时对污水管道在综合管廊内的位置关系和检查井设置方式提供设计原则和思路。In view of the requirement of installing sewage pipe in utility tunnel, a utility tunnel project in Qingdao airport was taken as an example to discussthecross-section design, outlet well form and inspection well set upduring the installation of sewage pipe in utility tunnel. The falling plate method was put forward as the outlet well form. Meanwhile, design principles and ideas were put forward for sewage pipe positioning the inspection well setting.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31