检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]青海省水利水电勘测设计研究院,青海西宁810008
出 处:《资源环境与工程》2017年第4期380-384,共5页Resources Environment & Engineering
摘 要:石头峡水电站地处祁连山南麓,工程区属于高寒高烈度地区,地质构造复杂,新构造运动强烈,区域内地震频发,大坝为面板堆石坝,趾板基岩为前寒武系变质岩系,岩体经历多期构造运动,断裂构造发育。通过分析趾板岩体工程特性,评价趾板岩体质量,处理趾板存在的地质缺陷,使趾板岩体质量达到设计建基要求。目前坝后渗流堰观测数据及坝体渗流检测数据正常。Shitouxia Hydropower Station is located in the south of Qilian Mountain, the area of project belongs to the al-pine and high intensity area,which is complex geological structure, regional earthquakes lrequently, and strong neotecton-ic movement. The dam is a lace rocklill dam, and the bedrock of toe slab belongs to precambrian metamorphic rocks. The multi - stage tectonic movement and fracture structure development is experienced by rock mass. In this paper, the engi-neering characteristics of toe rock mass are analyzed; the quality of toe plate rock mass is evaluated. The geological de-lects of toe slab are handled, to ensure the toe slab quality to meet the design requirements of loundation rock mass. Since then,observation data of llow weir and seepage detection data are normal of dam in currently.
分 类 号:TV223.3[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15