大石门水利枢纽工程左岸古河槽防渗措施三维渗流分析  被引量:5

3D Seepage Analysis on Impervious Facility in Ancient River Channel on Left Bank,Dashimen Project

在线阅读下载全文

作  者:焦阳[1] JIAO Yang(Xinjiang Water Resources and Hydropower Investigation Design and Research Institute, Urumqi 830000, Chin)

机构地区:[1]新疆水利水电勘测设计研究院,乌鲁木齐830000

出  处:《西北水电》2017年第5期39-42,共4页Northwest Hydropower

摘  要:大石门水利枢纽工程左岸205 m巨厚砂砾石层古河槽,水库蓄水后存在渗漏问题。通过三维渗流计算方法对左岸古河槽进行渗流稳定计算分析,模拟选取的防渗帷幕布置,分析防渗措施的长度及渗流参数对渗漏量的影响,为防渗措施方案的选择提供了指导意义。The ancient river channel in 205 m hugely thick sandy gravel on left bank of Dashimen project seeps after the reservoir impoundment. Through 3 D seepage calculation method,seepage stability of the river channel is calculated and analyzed. The proposed impervious curtain arrangement is simulated. Impacts on seepage volume from the length and seepage parameter of the impervious facility are analyzed. This guides selection of scheme for the impervious facility.

关 键 词:巨厚砂砾石层 古河槽 渗透系数 防渗处理 三维渗流分析 

分 类 号:TV697.32[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象