福州海峡国际会展中心钢桁架施工全过程数值模拟及监控  被引量:10

Numerical simulation and monitoring of the whole construction process of steel truss of Fuzhou strait international convention and exhibition center

在线阅读下载全文

作  者:杨伟[1,2] 

机构地区:[1]福建省建筑科学研究院,福建福州350025 [2]福建省绿色建筑技术重点实验室,福建福州350025

出  处:《地震工程与工程振动》2017年第5期87-95,共9页Earthquake Engineering and Engineering Dynamics

基  金:国家自然科学基金青年科学基金项目(51308226)~~

摘  要:对某会展中心钢桁架的施工过程进行数值模拟分析和监控。针对制定的钢桁架施工方案,采用MIDAS/GEN软件进行施工全过程数值模拟分析,以确保方案的可行性;同时对施工过程钢桁架的变形和关键受力部位的应力进行监测,以保证结构在施工过程中的安全,并验证数值模拟的准确性。测试结果表明:本工程数值模拟准确,施工方案可行,卸载后结构处于安全状态。The whole construction process of steel truss of a exhibition center is simulated and monitored. According to the construction scheme of steel truss, MIDAS/GEN software was used to carry out numerical simulation analysis of the whole process of construction, in order to ensure the feasibility of the scheme. In the same time, the deformation of the steel truss and the stress of the key parts in the constructional process were monitored, in order to ensure the safety of the structure. Also, the accuracy of numerical simulation was verified. The test results show that the numerical simulation is accurate, the construction scheme is feasible, and the structure is in a safe state after unloading.

关 键 词:数值模拟 施工监控 大跨度 钢桁架 

分 类 号:TU393.3[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象