检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:聂守智 Nie Shouzhi(XV an Engineering Investigation and Design Research Institute of China National Non-Ferrous Metals Industry, Xi'an 710054, China)
机构地区:[1]中国有色金属工业西安勘察设计研究院,陕西西安710054
出 处:《山西建筑》2017年第31期59-61,共3页Shanxi Architecture
摘 要:蒲城电厂厂区一期工程自建成投入使用以来,厂区内各建筑物一直处于变形状态,不断的下沉。对厂区内各建筑物的不均匀沉降进行分析,探讨其不均匀沉降原因,为湿陷性黄土地区地基处理方案提供可靠依据。Since the first stage project of Pucheng power plant has been built and put into use, the buildings in the plant have been in a state of deformation and sinking continuously. In this paper, the uneven settlement of buildings in the plant area is analyzed, and the causes of uneven settlement are discussed, in order to provide a reliable basis for the foundation treatment of collapsible loess area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30