检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东乾元工程集团有限公司,山东东营257091 [2]黄河上中游管理局,陕西西安710021 [3]中国水利水电科学研究院,北京100048
出 处:《水利建设与管理》2017年第11期77-79,107,共4页Water Conservancy Construction and Management
摘 要:本文采用实测资料分析的方法,研究了黄河下游河道整治工程建设的现状与存在的问题。研究结果表明:小浪底水库运用初期,长期下泄清水,黄河下游河势发生较大变化,个别河段现有河道整治工程的适应性明显不足。为确保黄河下游防洪安全,保障小浪底水库调水调沙,必须修建新布点工程,对一些关键性控制工程进行适当改造,有效控制河势,防止发生"横、斜河"和"滚河"。In the paper,measured data analysis method is adopted to study the present situation and existing problems during the construction of river channel improvement in the lower reaches of Yellow River. The research results show that clear water is discharged for long term at the initial stage of applying Xiaolangdi Reservoir. The river regime is greatly changed at the lower reaches of the Yellow River. The existing river governance projects have prominently insufficient adaptability in some river sections. New distribution projects must be constructed in order to ensure the flood control safety at the lower reaches of the Yellow River and guarantee the water and sand scheduling application in Xiaolangdi Reservoir.Some critical control projects are suitably modified,thereby effectively controlling the river regime, and preventing‘transverse river,inclined river' and‘rolling river'.
分 类 号:TV85[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.92.7