检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡鑫
机构地区:[1]辽宁省观音阁水库管理局,辽宁本溪117100
出 处:《中国水能及电气化》2017年第11期17-19,共3页China Water Power & Electrification
摘 要:观音阁水库输水工程设计年供水能力40243万m^3,设计多年平均发电量1633万KW·h。本文从盈利能力、偿债能力和财务生存能力三个方面对观音阁水库输水工程进行财务分析评价。结果表明:观音阁水库输水工程项目具有良好的盈利能力及财务生存能力和偿还贷款能力,在财务上合理、可行。The designed annual water supply capacity of Guanyinge Reservoir water diversion project is 402 .43 million cubic meters. The designed multi-year average generating capacity is 16. 33 million KW*h. In the paper, water diversion project of Guanyinge Reservoir is financially analyzed and evaluated from three aspects of profitability analysis, solvanalysis and financial viability analysis. The results show that water diversion project of Guanyinge Reservoir has goodprofitability, financial viability and solvency ability, which is reasonable and feasible in finance.
分 类 号:F406.7[经济管理—产业经济] F426.91[水利工程—水利水电工程] TV697
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33