观音阁水库输水工程财务分析评价  被引量:4

Financial Analysis and Evaluation on Water Diversion Project of Guanyinge Reservoir

在线阅读下载全文

作  者:胡鑫 

机构地区:[1]辽宁省观音阁水库管理局,辽宁本溪117100

出  处:《中国水能及电气化》2017年第11期17-19,共3页China Water Power & Electrification

摘  要:观音阁水库输水工程设计年供水能力40243万m^3,设计多年平均发电量1633万KW·h。本文从盈利能力、偿债能力和财务生存能力三个方面对观音阁水库输水工程进行财务分析评价。结果表明:观音阁水库输水工程项目具有良好的盈利能力及财务生存能力和偿还贷款能力,在财务上合理、可行。The designed annual water supply capacity of Guanyinge Reservoir water diversion project is 402 .43 million cubic meters. The designed multi-year average generating capacity is 16. 33 million KW*h. In the paper, water diversion project of Guanyinge Reservoir is financially analyzed and evaluated from three aspects of profitability analysis, solvanalysis and financial viability analysis. The results show that water diversion project of Guanyinge Reservoir has goodprofitability, financial viability and solvency ability, which is reasonable and feasible in finance.

关 键 词:观音阁水库 输水工程 财务评价 

分 类 号:F406.7[经济管理—产业经济] F426.91[水利工程—水利水电工程] TV697

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象